After the bamboo floor installation is complete, the installation of ceramic tile and carpet begin. Since carpet was selected for the Family Room and the two bedrooms in the basement and will abut to the two area of ceramic tile, the tile work has to be completed first.
As mentioned in our previous post titled “Bamboo Flooring” on March 17th, a prerequite for LEED® for Homes, Durability Management Process requires using a water-resistant flooring within 3’ of any entry door. Ceramic tile was selected to meet this requirement at the exterior basement door. The tile selected for the door location is American Marazzi, Augustus 61, 12” x 12” ceramic tile.